The refurbishment of a ground floor ward block (Kings College) and the formation of an Administration Department (Maudsley) whilst maintaining system operation to wards, and other operational areas, above and below.
Works involved heating, air-conditioning, ventilation, domestic hot and cold water, medical gases, controls, above slab drainage, water treatment and chlorination.

