With a late instruction, the stops were pulled out to enable all works to be commenced
and completed during the 7 week summer holiday.
The existing heating system comprising a mix of 1- and 2-pipe systems and in-slab
pipework was completely removed and replaced with new high level flow & return
circuits feeding a system predominantly consisting of low surface temperature
radiators.
Also involved in the project was the associated builderswork consisting of fabricating
and decorating pipe covers and casings.
All works were completed on time and budget
.
Project Value : £ 85,000.00