As Primary Contractor, involved in the replacement of underground and ducted distribution constant and variable temperature heating pipework using pre-insulated fusion welded MDPE sections.
Required arrangement of all necessary enabling ground works with subsequent backfilling, landscaping and re-planting. Much of the work was carried out during term time with the resulting necessity for excellent safe-working and staff/pupil protection.
Also included the procurement, delivery and craning-in of a pre-fabricated boilerhouse module for the swimming pool together with the arrangement and installation of a new gas main.